Deployment Strategy
Progressive Deployment
Eliminating risk through a phased, mastered implementation timeline.From pilot to national scale without disruption.
Phase 1 — 30 days
Pilot
Controlled initial deployment to validate operational fit.
- Limited perimeter and controlled scope
- Real-world testing conditions
- No heavy commitment required
- Continuous evaluation and feedback
Phase 2 — 90 days
Extension
Progressive scaling and team enablement.
- Gradual addition of capabilities
- Specialized team training
- National specific adjustments
- Controlled scaling velocity
Phase 3 — Full Scale
National Deployment
Complete sovereign rollout under state authority.
- Complete sovereign deployment
- National controlled hosting
- Total state control
- Full operational autonomy